- Kv2c Meter Manual mercedes benz ml350 owners manual v6 complete ge manual for kv2c socket meter : 650 kv2c meter manual | tricia joy truck owners ge kilowatt-hour.
- Enhancements over the kV2 Meter. The Encompass meters provide several enhancements over the kV2 meter. The kV2c and kV2c+ models provide calibration pulses that can.
GEH-7285, kV2c Encompass Electronic Meter Product Description • 1-1 1. Product Description GE’s kV2c Multifunction Meter represents a new level of functionality.
Monitoring to GE k. V2c Meters. Qualified Electricians Only. Any meter should be installed by qualified electricians only. Watt. Metrics cannot provide support or instruction for the installation of electricity meters.
Retrofits Must Be Preset Before Shipping. If a revenue- grade meter is installed as a retrofit for a system that has already produced a significant amount of energy, the meter must be preset by Watt. Metrics before it is shipped, with the correct production offset. Watt. Metrics Meters Only. GE k. V2c meters are compliant with ANSI C1. Part of these standards includes a security model that prevents Watt. Metrics from interfacing directly with a meter from another vendor (like a utility).
GE KV2C METER MANUAL Did you searching for Ge Kv2c Meter Manual? This is the best place to read ge kv2c meter manual before service or repair your product, and we. Connecting to GE kV2c Meters. Finish installing the agent as outlined in the 'installing agents' section of this manual. 3. If the meter is not wired to measure.
In order to be compatible with a Watt. Metrics system, the meter security must be configured by Watt. Metrics before the meter is shipped. GE k. V2c meters not from Watt. Metrics will not work with a Watt.
Metrics system. Installation Notes. A meter socket type 1. S is required for single phase meters and socket type 1. S is required for three phase meters. Specify single or 3- phase when ordering.
The meter must be installed within 1. Watt. Metrics agent.
The standard Watt. Metrics optical communications cable is 6', but can be extended in the field using off the shelf components to up to 1. The neutral leg of the meter must be connected for the meter to function correctly. Place the optical end of the Watt. Metrics USB- to- optical communications cable on the optical port of the meter (as illustrated by the image at right). Make sure the meter cover is rotated clockwise as far as it will go, otherwise the optical port will not line up with the cover and will not function.
The optical end of the cable has a magnet inside that holds it to the optical port on the meter. Watt. Metrics recommends using a zip tie or similar to secure the cable to the meter cover. Connect the USB end of the cable to a USB port on the agent.
Finish installing the agent as outlined in the "installing agents" section of this manual. If the meter is not wired to measure production: If the meter is wired to measure energy demand (or net demand), the installer must mark the meter as being a "demand" or "net demand" meter via the Watt. Metrics projects portal.